Civil Engineering | Reclaimed Water System
This project involves supplying reclaimed wastewater from the Benson Wastewater Treatment Plant to the South Johnston High School to irrigate four (4) athletic fields. The project includes continuous online turbidity monitoring, chlorine dosing, reclaimed water transfer pump station, approximately 9,200 ft of reclaimed water line, 6,000 gallon hydropneumatic tank, and radio telemetry. The project was funded through a combination of a High Unit Cost Grant and local funds.
