|
||||||
|
<< Previous ProjectNext Project >> Project consisted of mapping the entire stormwater collection system for the Town. All system features were mapped at sub-meter accuracy including manholes, pipes, junction boxes, inlet structures, major ditches, and discharge points. Over 47 miles of storm pipeline and ditches and 889 point features were mapped. Each feature was linked to receiving waters for utilization in future water quality monitoring. The network can be traced to determine the origin of effluent discharged to specific receiving waters. This project was funded through a Clean Water Management Trust Fund grant.
Project Manager: Alex Fuller |
|||||