The Wooten Company - Home

Home

Project-GISGPSFremont

Civil Engineering:

Water / Wastewater/ Stormwater Infrastructure Inventory

Fremont, North Carolina

Return to
Project List

<<   Previous ProjectNext Project  >>

Project consisted of capturing all water, wastewater, and stormwater system feature coordinates and elevations. This project was performed in conjunction with a full sanitary sewer evaluation and study. CMOM data from manhole inspections has been incorporated into the geodatabase. CMOM data is immediately available through GIS or IMS as it is associated with corresponding system features. Over 2,000 point features and their attributes were captured by GPS and imported into the geodatabase. The project includes more than 25 miles of water and wastewater system pipeline as well as underground and above ground stormwater conveyance systems.

 

Project Manager: Alex Fuller